Plumbing Fee Schedule
Residential – New Construction – Single family dwelling flat fee |
$200 |
Residential – New Construction – Multi-dwelling per unit. |
$ 150 |
Commercial – Flat Fee (1-5 fixtures) |
$ 75 |
Each additional fixture |
$ 5 |
Residential – Flat Fee (1-5 fixtures) |
$ 40 |
Each additional fixture |
$ 5 |
Re-inspection fee |
$ 50 |
Note: Any work not begun in six (6) months after a permit is issued voids the permit.
When work is started without the applicable permit, the applicable fee can be DOUBLED upon first notification and TRIPLED subsequent to completion.
Gas Fee Schedule
Residential – Flat fee (up to 3 fixtures) |
$ 40 |
Each additional fixture |
$ 5 |
Commercial/Multifamily – Flat fee (up to 3 fixtures) |
$ 50 |
Gas boiler |
$ 35 |
Gas Furnace |
$ 35 |
Gas Hot Water Heater (Combination Fee) |
$ 40 |
Note: Any work not begun in six (6) months after a permit is issued voids the permit.
When work is started without the applicable permit, the applicable fee can be DOUBLED upon first notification and TRIPLED subsequent to completion.
|